Framework for wim platform and boarding step |
Last week was miserable: Either the parts I had made didn't fit or I forgot something at home. So I try to work at home and the parts are on the boat... And then on Friday things came together: The shackles that were too big were changed by a friendly girl for a smaller size that was not in the catalog. The swim platform went on as designed, with almost no hassles, and came off again for rustproofing. The net under the bowsprit went on as planned. The electrical panels went on, but will need slight modifications.
Electrical panels: first fitting |
The panels between the toilet and the waste water tank came out as planned, now for the pipework. And a problem: The standpipe to the hull is 50mm. The outlet from the tank is 48mm. A 50mm gate valve/ball valve is actually 2 inches, so 58mm thread. And plumber suppliers just shrug and rill their eyes. So that has to be fixed before I can splash her. Also the sea chest inlet is 40mm, and I need to borrow a die to thread that, a ball valve (1.5 inch) is already waiting. A friend has an old plumber friend who will lend me his old manual die, these days everyone use machines to thread pipe and you must just bring your boat to the workshop....
Pirate number one |
Pirate number 2 |
I had help with fitting screws and unscrewing bolts: My pirates boarded me again. Such friendly, well-behaved pirates, Josh and Cooper.
I will only have helpers for two more working days, so there are priority lists...
No comments:
Post a Comment